Temporary Power Poles in Westlake Village
Power on your Westlake Village site. Without the runaround.
50A sub poles and 100, 200 or 400A meter poles, overhead or underground. Installed by our crew, connected by SCE.
✓ Takes less than 60 seconds · No obligation · In a hurry? Call (818) 960-1941
Dispatch in 1–3 daysTrusted by teams across California
What customers say
“Super efficient with booking and clear upfront communication”
Poles
Pole options for Westlake Village sites
50A Sub Pole
A smaller pole fed from an existing supply. Good for tools and lighting.
100A Meter Pole
Its own meter, connected by SCE. For smaller builds and remodels.
200A Meter Pole
The size most residential builds need.
400A Meter Pole
For larger builds and heavier loads.
Amp = how much power the pole can supply. Not sure which you need? Pick 'not sure' in the quote form and we'll help.
Overhead poles take power from a nearby utility line. Underground poles connect to a buried supply. Your site decides which.
Get My Free Power Pole Quote →Who does what
Your part, our part, SCE's part
| Step | Who |
|---|---|
| Call DigAlert 811 so buried lines get marked (free) | You or your electrician |
| Supply and install the pole | All Site Rentals |
| Pull the electrical permit from City of Westlake Village | You or your electrician |
| Book the inspection | You or your electrician |
| Connect and energize the pole | SCE |
From permit to power-on usually takes 3–6 weeks. Most of that is the inspection and the SCE connection. Book the pole early.
Pricing
What a temporary power pole costs in Westlake Village
Setup typically runs $1,000–2,500, then $95–200 a month. Permit, inspection and SCE fees are paid by you, separately.

Local knowledge
Temporary power in Westlake Village: what to know
Westlake Village sites are served by SCE. The electrical permit comes from City of Westlake Village. Start that paperwork when you book the pole.

Frequently asked
Power pole questions from Westlake Village
Need an answer specific to your site? Call (818) 960-1941.

What size power pole do I need?
Most residential builds need a 200A meter pole. Smaller jobs may need 100A; larger builds 400A. A 50A sub pole runs from an existing supply. Not sure? Ask in the quote form.
Who pulls the permit for a temporary power pole in Westlake Village?
You or your electrician. The permit comes from City of Westlake Village. We supply and install the pole. Your electrician books the inspection and arranges the SCE hookup.
How long can I keep a temporary power pole?
For as long as the job runs, billed monthly.
Are you licensed?
Yes. All Site Rentals is licensed and insured.
Can I get fencing and restrooms with the pole?
Yes. Add them in the same quote form. One contact, one quote, one crew.
Nearby areas
Temporary power poles near Westlake Village
Also in Westlake Village: porta potty rental · restroom trailers · temporary fencing
Ready when you are











