
Above-ground fence panels
- Galvanized steel
- 6 ft or 8 ft high
- No ground penetration
Power up from day one. We supply and install sub poles and meter poles for builds across LA. Overhead or underground, sized to your job.
Setup from $1,000, then from $95 a month. Permits, inspection and utility fees are paid to the city and utility.
See your price in under 60 seconds →
✓ Takes less than 60 seconds · No obligation · In a hurry? Call (818) 960-1941

Trusted by teams across California











Overview
A temporary power pole gives your site metered power until the permanent service is in. A sub pole runs off existing power. A meter pole gets its own service from LADWP or SCE. We supply the pole and install it. You keep building.

Pole sizes
| Pole | What it does | Typical use |
|---|---|---|
| 50 amp sub pole | Feeds off existing power on site | Small remodels, extra outlets |
| 100 amp meter pole | Its own metered service | Smaller builds |
| 200 amp meter pole | Its own metered service | Most residential builds |
| 400 amp meter pole | Its own metered service | Larger builds and commercial jobs |
Not sure which you need? Start your quote and our team will help you choose.
View pole details →Permits and hookup
From permit to power-on usually takes 3–6 weeks. Most of that is the inspection and the utility. Plan early.
| Step | Who |
|---|---|
| 1. Call DigAlert 811 so underground lines are marked (free) | You or your electrician |
| 2. Pull the electrical permit | You or your electrician |
| 3. Supply and install the pole | All Site Rentals |
| 4. Book the inspection | You or your electrician |
| 5. Arrange the LADWP or SCE hookup | You or your electrician |
Pricing
Expect a one-time setup cost, then a monthly rental. Our cost guide puts setup at $1,000–$2,500 and rental at $95–$200 a month. Permits, inspection and utility fees are paid separately to the city and utility.
Full power pole cost guide →Reviews
“Very professional and fast service.”
“Super efficient with booking and clear upfront communication”
Simple from start to finish
Tell us the amps and overhead or underground.
Fast, upfront and honest.
Tell us when and where.
On time, set up properly, done.
✓ Takes less than 60 seconds · No obligation · In a hurry? Call (818) 960-1941
No. You or your electrician pull the electrical permit and book the inspection. We supply and install the pole.
You or your electrician. The utility energizes the pole after it passes inspection.
Usually 3–6 weeks from permit to power-on. Most of that is inspection and utility scheduling.
200 amp suits most residential builds. Bigger or commercial jobs may need 400 amp. Not sure? Ask in your quote.
It depends on how the utility serves your lot. Your electrician or the utility will confirm. We install either.
Yes, before the pole goes in. It's free, and it marks underground lines.
Setup from $1,000–2,500, then $95–200 a month. Permits and utility fees are extra.
For the life of your build. Your quote sets the term.
Related products


From $168.98/month with weekly service

Service areas
Also covering: Hollywood · Oxnard
Ready when you are
Fast quotes. Honest prices. Want to chat? Great. Rather not? Also great.
Get My Free Power Quote →Less than 60 seconds • No obligationRather talk? Call (818) 960-1941